Building & civil engineering
Concrete plants
Exploitation of quarries
Drilling and piles
Photos of some achievement
Photos of the achievements in implementation phase


















Some realizations

Some realizations presented here reflect the control and the means of SCB. Each of them illustrates a type of constructions: office buildings, commercial buildings, residential buildings or industrial buildings. This list is far from being –exhaustive

 

Construction of filling station

 

Galana « IARIVO » Soanierana

Building owner: GALANA DISTRIBUTION PETROLIERE
Project superintendent: GALANA DISTRIBUTION PETROLIERE
Technical control: SOCOTEC
Finishing and equipment: CIMELTA
Time: 03 months - Construction of new building (shop and technical bay)

Installation of new fuel tanks oil tanks
VRD and purification
Other equipments
Arrangement of the area of distribution and circulation track
Arrangement of green spaces




Construction of filling station - TOTAL « SOANIERANA »

Building owner: TOTAL MARKETING MADAGASCAR
Project superintendent: Geneviève BRUNET Architecte
Technical control: SOCOTEC
Finishing and equipment: CIMELTA
Time: 03 months

Construction of the new technical bay
Installation of new fuel tanks and oil tanks
VRD and purification
Other equipments
Arrangement of the area of distribution and circulation track
Arrangement of green spaces




Construction of administration building -4-storeyed – BCM

Building owner: Central Bank of Madagascar
Project superintendent: Cabinet JARY
Technical control: SOCOTEC
Finishing and equipment: CIMELTA
Time: 14 months

The construction at Antsahavola (current center of Antananarivo city) of this new 4-storeyed administration building follows the demolition of an old one. The 2 560 m ² of useful surfaces are occupied by the Central Bank of Madagascar
* The activities of concrete plants, quarries, boreholes and piles are outside the scope of certification SCB.

 




Construction of villas

Building owner: SCIDI
Architect: Jean Claude DUBOIS
Project superintendent: SCB
Finishing and equipment: CIMELTA
Time : 05 months

SCB realized luxury villas of a surface out of work of 350 m ² each. Situated in the district of Ivandry, villas contain: lounge, dining room, kitchen, rooms, bathroom, toilets, dressing room, garage, swimming pool.






Constructing 4-floor apartment blocks at Ivandry

Building owner: SCIDI
Architect: Jean Claude DUBOIS
Technical control: SOCOTEC
Structural work, framing and roofing: SCB
Finishing and equipment: CIMELTA
Time: 20 months to 1998 from 2000

SCB carried out the shell of these seven apartment blocks each of 2.750 m ² overall surfaces. It required nearly 9.850 m ² of concrete. Located in Ivandry, the buildings have luxury apartments with living room, dining room, kitchen, rooms, bathroom, toilet, Dressing, garage, balcony and terrace.



Shell of 9-floor Fitaratra business center

Building owner: SIMAD
Architect: Jean Claude DUBOIS
Project superintendent: ESPACE INGENIERIE
Technical control: SOCOTEC
Finishing and equipment: CIMELTA
Time (structural work): 16 months

SCB provided and used nearly 7.250 m ³ of concrete to make the shell of this commercial building located at Ankorondrano, Antananarivo. The 14.450 m ² overall surface building for business use has deep foundations, a pavement, a framework and a reinforced concrete full floor as well as flagstone and curtain wall frontage.

 


Building of a 7- storeyed international hotel

Building owner: Society EDEN
Project superintendent: Cabinet DUBOIS
Technical control: SOCOTEC
Finishing and equipment: CIMELTA
Time: 18 months

SCB has done the shell of this 174 room hotel in Ankorondrano; new downtown of Antananarivo. This international hotel will be managed by the ACCOR group with the IBIS trademark.







Constructing AQUAMAD's 2-floor trade building

Building owner: TRICOMAD
Finishing and equipment: SCB
Finishing and equipment: CIMELTA
Time: 8 months

The shell of this building with reinforced concrete paving, steel skeleton and framework, composite floor was carried out by the SCB. It comprises 3.300 m ² storage surfaces with loading bay, 450 m ² Show room, 900 m ² office buildings as well as medical blocks. The building is located at Anosivavaka, Antananarivo.


 
 

Certified ISO 9001-2008